Design1
Test MassingTest Massing
CommandCompare massing options by computed GFA, height, and net area
Code & Zoning18
Explain CodeExplain Code
CommandPut a code section in plain English
Count Loading BerthsCount Loading Berths
CommandWork out required loading berths from the table you supply
Draft LetterDraft Letter
CommandWrite a letter to the building department
Explain EasementExplain Easement
CommandExplain what an easement on your survey does to what you can build
Explain SoilsExplain Soils
CommandExplain a geotechnical recommendation in plain English
Explain ZoningExplain Zoning
CommandPut a zoning clause in plain English for your site
Lookup Flood ZoneLookup Flood Zone
CommandFind a parcel's flood zone and base flood elevation, with its source
Test ADATest ADA
CommandMath-check one accessibility clearance against the source
Test EgressTest Egress
CommandCheck one egress question - pass, fail, or marginal
Test FARTest FAR
CommandCheck floor area ratio, coverage, setback, and height
Test Fire RatingTest Fire Rating
CommandCheck the required hourly rating for an element
Test Occupant LoadTest Occupant Load
CommandCompute occupant load when you already have the table row
Test Open SpaceTest Open Space
CommandCheck provided open space against what the district requires
Test ParkingTest Parking
CommandCheck required parking count and accessible spaces
Test RampTest Ramp
CommandCheck a ramp's slope, landings, and handrails
Test StairTest Stair
CommandCheck stair geometry when you already have the code text
Structure & MEP5
Compare Structural SystemCompare Structural System
CommandPut structural systems side by side on what each does to the architecture
Explain Load PathExplain Load Path
CommandTrace how load travels from roof to foundation
Explain Panel ScheduleExplain Panel Schedule
CommandRead an electrical panel schedule and say what it means for the architecture
Explain Riser DiagramExplain Riser Diagram
CommandRead an MEP riser diagram and find where it disagrees with the plans
Size ShaftSize Shaft
CommandAdd up what has to fit in a shaft, plus the room to install and reach it
Envelope7
Compare AssemblyCompare Assembly
CommandPut two or more envelope build-ups side by side on criteria you name
Explain U-valueExplain U-value
CommandCheck an assembly's R-value against your climate zone
Explain Vapor RetarderExplain Vapor Retarder
CommandExplain what a vapor retarder does, and what it is being asked to do here
Lookup R-valueLookup R-value
CommandLook up an assembly R-value or U-factor
Size LouverSize Louver
CommandAdd up the louver face a mechanical airflow needs, from data you supply
Test EnergyTest Energy
CommandCheck one assembly against the energy table for your zone
Test GlazingTest Glazing
CommandCheck a window against the energy table for your zone
Documents & Construction17
Explain DrawingExplain Drawing
CommandExplain a detail, callout, or section in plain English
Explain SpecExplain Spec
CommandExplain a specification section in plain English
Draft ASIDraft ASI
CommandInstruct the contractor without changing cost or time
Draft BulletinDraft Bulletin
CommandWrite a cover letter for a bulletin or addendum
Draft CalloutDraft Callout
CommandWrite the text inside a drawing callout
Draft CCDDraft CCD
CommandDirect a change before cost and time are agreed
Draft General NoteDraft General Note
CommandWrite a general note that says something, and put it on the right sheet
Draft RFI ResponseDraft RFI Response
CommandAnswer an RFI without giving away scope, cost, or time
Explain BidExplain Bid
CommandSeparate real costs from risk-shifting in bid language
Explain StampExplain Stamp
CommandExplain what a submittal stamp commits you to
Lookup CostLookup Cost
CommandLook up a cost-per-square-foot benchmark, quoted with its source
Lookup CSILookup CSI
CommandFind the spec section number for a product or scope
Business6
Draft EmailDraft Email
CommandWrite the project email, and check whether it should be an email at all
Draft Additional ServicesDraft Additional Services
CommandDraft an additional services request before the work is done, not after
Draft ProposalDraft Proposal
CommandDraft a fee proposal that says what is not included
Explain AIAExplain AIA
CommandRead a contract clause from all three sides
Explain COIExplain COI
CommandExplain a certificate of insurance and what it does not prove