Embodied Carbon Tracker
Track embodied carbon by stage against factors you supply
Once installed, Claude loads it on its own when your conversation matches. You can also call it directly with /embodied-carbon-tracker.
Install just this one
npx archtmpl@latest --skill embodied-carbon-tracker --globalFirst time? The whole install, step by step
- Open Claude Code — the terminal version or the desktop app, either one.
- In a terminal, paste the line above and press Enter. In the app, paste it into the chat and ask Claude to run it.
- Restart Claude Code. That's the whole install.
Set up plugins for me: run `claude plugin marketplace add https://archaiflow.com/plugins/marketplace.json` and then `claude plugin install embodied-carbon-tracker@archaiflow`Paste into the Code tab (not Chat or Cowork) and approve when Claude asks. The third-party marketplace it mentions is this site. Windows may ask to install Git once.
What this skill does
Embodied Carbon Tracker
Embodied carbon gets reported as one number at one moment, usually late, usually to satisfy a requirement. The number is not the useful part. Which element carries the most, and what happened to it when the structure changed, is, and neither survives being totalled.
Workflow
Step 1. Fix the boundary and the source before any number
Ask, in one message:
- What is being counted: which life-cycle stages, and which elements? Upfront only, or through use, end of life and beyond?
- What is in scope and what is out: structure, envelope, finishes, services, site, temporary works, furniture?
- What data source for factors, and what vintage? An EPD per product, a generic database, or a mix?
- What geography do the factors assume, and does it match where this is built?
- Is there a target or a requirement, quoted, and on what boundary was it set?
- Where do quantities come from, and who produces them?
Two projects' figures are comparable only when both boundaries and both data vintages are stated. Record them once, at the top of the log, and repeat them on every output. A figure quoted without them is not a figure.
Step 2. Log per element and per stage, never as a total
| Element | Quantity | Unit | Factor | Source | Vintage | Stage | Result | Date |
|---|
Keep the stages separate. Upfront carbon and end-of-life behave differently under a design change, and a combined figure moves for reasons nobody can trace.
Every row carries its factor's source and vintage in the row, not in a note somewhere. When a factor is updated, the old row stays and a new row is added.
Where a quantity is an estimate rather than a take-off, mark it. Early figures are mostly estimates and that is fine; pretending otherwise is not.
Step 3. Record what moved, and why
The point of the log:
| Date | What changed in the design | Element affected | Before | After | Who decided |
|---|
Every design change that moves a number gets an entry. A structural system change, a facade material change, a change in floor build-up, a specification change from the contractor.
Never overwrite a previous figure. The sequence is the record, and a project that can say what a decision cost in carbon is a project that can make the next one deliberately.
Step 4. Read the shape, not the total
At each read-back:
- The largest contributors, ranked. Usually a short list and usually the structure. This is the only ranking worth acting on.
- What has moved since last time, with the decision attached.
- What is still estimated rather than taken off, counted.
- What is out of the boundary, restated, because it is the first thing anyone forgets.
- The factors that are generic rather than product-specific, and where a product EPD would change the answer materially.
- Against the target if there is one, on the target's own boundary, and say plainly when the two boundaries differ.
Step 5. Say what the number is not
On every output, three lines:
- The boundary and the data vintage.
- That this is a running record, not an assessment.
- That the figure is comparable only to figures on the same boundary with comparable data.
Where a figure will be reported outside the team, say that an assessment by a practitioner is what belongs in a report, and that this feeds it.
Step 6. Write the log
One dated file per project, appended to rather than rewritten. Ask where it lives on the first run and use the same path after.
Rules
- Never supply an emission factor or a benchmark. Every one comes from a source you name, with a vintage.
- State the boundary and the data vintage on every output.
- Keep results per element and per stage. Never report one total alone.
- Mark estimated quantities as estimated.
- Never overwrite a figure. Add a row and record what changed.
- Attribute every movement to a design decision and a decider.
- Say on every run that this is a running record and not an assessment.
Anti-patterns
- Reporting one number.
- Recalling a factor for concrete, steel or timber because the figure is well known.
- Comparing against a benchmark set on a different boundary.
- Using a generic database factor for the one element that dominates the result.
- Overwriting the earlier figure when the design changes, which loses the only interesting information in the log.
- Counting the envelope carefully and leaving the structure as an estimate, when the structure usually dominates.
- Presenting the running record as an assessment.
- Ignoring the data vintage because the factor came from a reputable source.
Resources
None. This skill is one file. The log is written at the path you choose on the first run and appended to after.
What it does not check
What this does. Keeps one dated log per project. Records quantities, the factor applied to each with its source and vintage, and the result per element and per life-cycle stage. Tracks how each moves as the design changes, so a decision can be attributed rather than guessed at.
What this does not do.
- It carries no factors and no benchmarks. Every emission factor comes from an environmental product declaration or a database you name, with its vintage and its geography. Factors differ by product, by plant, by year and by country, and a recalled figure is a wrong one.
- It is not an LCA. A life-cycle assessment has a method, a scope and a practitioner. This is the running record a design team keeps between assessments, and it says so on every output.
- It does not take off quantities. Yours, from the model or the drawings, with the basis recorded.
- It does not plan the reduction path.
decarbonization-strategistdoes that over five to fifteen years, mostly operational; this counts what the materials carry. - It does not certify.
leed-trackerandpassive-house-trackerhold certification scorecards. - It does not replace the sustainability consultant.
What you need before starting. What is being counted and to what boundary. The data source for factors, named. Quantities, with what they came from. The requirement or target, if there is one, quoted.
Files it puts on your disk
.claude/skills/embodied-carbon-tracker/1 file · 7.3 KBSKILL.md7.3 KB