Read any consultant's drawing against the architectural set
Once installed, Claude loads it on its own when your conversation matches. You can also call it directly with /consultant-drawing-review.
Install just this one
npx archtmpl@latest --skill consultant-drawing-review --globalFirst time? The whole install, step by step
- Open Claude Code — the terminal version or the desktop app, either one.
- In a terminal, paste the line above and press Enter. In the app, paste it into the chat and ask Claude to run it.
- Restart Claude Code. That's the whole install.
Set up plugins for me: run `claude plugin marketplace add https://archaiflow.com/plugins/marketplace.json` and then `claude plugin install consultant-drawing-review@archaiflow`Paste into the Code tab (not Chat or Cowork) and approve when Claude asks. The third-party marketplace it mentions is this site. Windows may ask to install Git once.
What this skill does
Consultant Drawing Review
Three disciplines have a review skill here and a project has eight consultants. The acoustician, the kitchen consultant, the security consultant and the landscape architect all issue drawings that nobody reads against the architectural set until somebody notices a conflict on site.
The failures are the same whatever the discipline, which is why one skill covers all of them.
Workflow
Step 1. Establish what you are comparing
Ask, in one message:
- Which consultant, and what is their scope?
- What revision is each set, and which architectural background were the consultant's drawings drawn on?
- What are they issued for: coordination, tender, construction?
- What are the architectural constraints that matter here: clear heights, fixed dimensions, spaces that must stay clear?
- Is there a federated model, or separate drawings?
Question 2 first, every time. A consultant's set drawn on a superseded background will disagree with the current plans everywhere, and reviewing it line by line before establishing that wastes the review and insults the consultant. If the background is old, stop and say so.
Step 2. Grids, levels and names
Nothing after this is meaningful if these disagree:
- Grid designations and spacing, both sets.
- Level names and their elevations, both sets.
- What each set means by a level name. Top of slab, finished floor, top of structure: the same name meaning different things is the single most productive source of error between two sets.
- The building outline and the north point.
- Room names and numbers, if the consultant uses them.
Step 3. Find what lands where it cannot
Whatever the discipline, the drawing puts things in space:
| Location | What the consultant shows | What is there architecturally | Conflict |
|---|
Work through: anything in a room that has to stay clear, anything in a required clearance zone, anything crossing a rated assembly, anything in a ceiling void that is already full, anything on a wall that is glazed, anything in a shaft, anything above a space with a fixed clear height, and anything outside the building that lands in a route, a setback or a planting area.
Report both values on every conflict and rule on neither.
Step 4. Find what they have deferred, and to whom
Every consultant's set defers work, legitimately, and the deferral has to land on somebody:
- Anything marked by others, by contractor, delegated design, or to be confirmed.
- Anything shown diagrammatically that somebody will have to draw properly.
- Anything requiring a builder's work opening, a support, a plinth, or backing that is nobody's drawing yet.
- Anything requiring access that no ceiling or panel currently provides.
A deferred item with no owner is a gap the architect stands in. List each with who should own it.
Step 5. Find what neither set shows
The most valuable list and the hardest to produce. Go through what this consultant's scope implies and check each appears somewhere: on their drawings, on the architectural, or nowhere.
Report the third category individually. On a project with eight consultants, most of what gets found on site is in that list.
Step 6. Report
| # | Finding | Consultant shows | Architectural shows | Kind |
|---|
Kind is background, grid or level, conflict, deferred, gap, or
duplicate.
Order: background and level problems first, since they invalidate the rest, then conflicts affecting a fixed dimension, then deferred items with no owner, then gaps.
Close by saying no engineering was reviewed, and point at coordination-log.
Step 7. Save, if asked
Ask whether to write the review to a file and where.
Rules
- Check the background revision before reading anything. Stop if it is old.
- Never check or comment on the engineering.
- Establish what each set means by a level name.
- Report both values on every conflict and decide neither.
- List every deferred item with an owner, or flag that it has none.
- Produce the list of what neither set shows.
- Where a deeper skill exists for that discipline, name it.
Anti-patterns
- Reviewing a consultant's set drawn on a superseded background, line by line.
- Checking whether the engineering is right.
- Assuming two sets mean the same thing by the same level name.
- Choosing which set is correct.
- Treating a deferred note as somebody else's problem by default.
- Reviewing only the disciplines that have their own skill.
- Reporting conflicts and never producing the gap list.
Resources
None. This skill is one file. Output is written directly at the path you choose.
What it does not check
What this does. Reads any consultant's drawing against the architectural set for the five things that go wrong regardless of discipline: the background, the grids and levels, spatial conflicts, deferred work with no owner, and plain disagreements between the two sets.
What this does not do.
- It checks no engineering. Not a size, not a load, not a capacity, not a rate. Those are sealed by somebody and second-guessing them from an architect's chair is useless.
- It carries no values.
- It does not replace the three deeper skills.
mep-review,structural-drawing-reviewandcivil-drawing-reviewgo further on those disciplines; use them where they exist and this where they do not. - It does not do penetrations.
penetration-reviewbuilds that register. - It does not resolve conflicts.
coordination-logtracks them to closure. - It does not replace the engineers or the Architect of Record.
What you need before starting. The consultant's drawings and the architectural set, with both revisions stated. The architectural background the consultant drew on. What that consultant's scope is supposed to be.
Files it puts on your disk
.claude/skills/consultant-drawing-review/1 file · 6.9 KBSKILL.md6.9 KB